New Bridge Complete at Bogingore

P1000561

New Bridge at Bogingore

Despite the wet and cold start to November the new bridge at Bogingore, Muir of Dinnet is complete. Even after “going over the wellie” in the burn a few times, bridge builders Gordie and Neil remained stoic to the end. The result is a topper of a bridge, already being well recieved by walkers with a penchant for dry feet.  The bridge is a 5m span and sports a non-slip deck. The team are now off to Shetland to carry on with the new path at Hermaness, Unst. Here’s hoping for a calm crossing!


RSS Met Office weather warnings

  • An error has occurred; the feed is probably down. Try again later.